Forensic Intelligence / Schedule Delay Review
Turn schedule history into defensible forensic intelligence.
Pathizer helps teams analyze P6/XER schedule history, identify delay and recovery movement, trace float and logic changes, and generate evidence-backed narratives for claims, disputes, and executive review.
Built for owners, contractors, consultants, and controls teams that need schedule evidence they can defend.
Forensic Preview
Delay movement detected
Net Delay
-24 CD
Recovery Claimed
6 CD
Evidence Items
9
Finding
Turnover recovery shown in Update 14 was partly offset by logic changes and downstream float erosion.
Narrative
The update shows apparent recovery, but supporting schedule evidence indicates the recovery was not fully realized. Logic changes and downstream float movement reduced confidence in the revised forecast.
Delay Review Problem
Most delay reviews start after the story is already fixed.
By the time a project reaches a claim, dispute, or executive escalation, teams are left reconstructing months of schedule movement from update files, narratives, meeting notes, and competing explanations. Pathizer gives teams a faster way to trace the schedule record and explain the evidence.
When did it move?
Which path actually drove the delay?
Did recovery happen, or was the schedule resequenced?
Where did float erode?
Which logic changes affected the forecast?
What schedule evidence supports the finding?
Forensic Workflow
From schedule files to defensible findings.
Pathizer turns historical P6/XER updates into a repeatable forensic review: compare update movement, trace delay and recovery through float and logic changes, identify evidence-backed findings, and generate narrative language that can be reviewed by controls, executive, claims, and legal teams.
Schedule Diagnostic + Pathizer Score
Forensics preview
Executive Narratives
Produces schedule update narratives from actual movement so teams can explain what changed, what it means, and where the evidence lives without replacing scheduler judgment.
Focused Capabilities
Built for forensic schedule review.
Historical Update Review
Compare P6/XER updates across time to identify delay movement, recovery claims, float erosion, and shifting forecast logic.
Float & Logic Analysis
Trace how float, predecessor and successor relationships, logic ties, and path movement changed across the schedule record.
Evidence-backed Findings
Connect findings to activity-level schedule evidence so claims, disputes, and executive narratives are easier to defend.
Forensic Narrative
Generate clear professional language that explains what changed, why it matters, and what evidence supports the conclusion.
Recovery Quality Review
Separate real recovery from resequencing, compression, cosmetic forecast movement, and downstream float loss.
Expert Workpaper Support
Preserve a repeatable schedule evidence trail for consultants, controls teams, attorneys, owners, and contractors.
Contextual Schedule Copilot
Ask Pathizer explains schedule evidence inside the workflow.
Ask Pathizer is grounded in actual Primavera P6 XER schedule evidence, turnover drivers, update review findings, float path context, and window analysis artifacts. It supports schedule review without replacing scheduler, consultant, or legal judgment.
Product Previews
See causation proof from two angles.
Review activity-level timing in Window Analysis, then trace the evaluated path that carries delay or recovery to each turnover milestone.
Window Analysis / TIA
Compare baseline, inserted impacts, and current movement by WBS and activity to support defensible causality review.
Activity-level evidence of what changed between updates.
Pathizer Diagram
Trace evaluated path nodes from project start through controlling activities to turnover finish.
Path-level proof of how impact moves toward a turnover milestone.
Turnover Drivers
Trace the activities and trades driving turnover movement.
Contractor Risk Exposure
Quantify trade-level schedule exposure before it becomes a claim.
Where Forensic Intelligence Fits
Built for high-stakes schedule review.
Owners, contractors, consultants, controls teams, executives, and legal teams can use Pathizer when delay narratives need to be traced back to the schedule record.
Why Teams Adopt
Evidence-backed schedule forensics without weeks of reconstruction.
Reconstruct schedule history faster
Reduce the manual effort required to compare update files and identify meaningful movement.
Strengthen claims and disputes
Tie delay narratives to schedule evidence instead of relying on unsupported recollection.
See recovery quality clearly
Separate real recovery from resequencing, compression, or cosmetic forecast movement.
Preserve evidence
Maintain a defensible record of schedule movement, logic changes, and path impacts.
Improve executive communication
Turn complex forensic findings into concise, review-ready language for leadership and legal review.
Forensics
Not just dates. Evidence.
Most tools show schedule data. Pathizer explains the schedule record: what changed, why it changed, and what evidence supports the conclusion.
Identify. Quantify. Prove.
| Category | Pathizer | Traditional Historical Review |
|---|---|---|
| Time to Insight | Minutes | 2-6 weeks |
| Typical Cost | $50-$1,000+ per covered data month by schedule complexity | $20,000-$100,000+ per analysis |
| Repeatability | Run across every update data date | Usually one-off or limited scope |
| Transparency | Evidence-linked, activity-level findings | Report-based, manual review |
| Scalability | Scales by schedule complexity and update count | Limited by consultant time |
| Consistency | Standardized analysis logic | Varies by analyst and method |
| Analysis Approach | Deterministic, rules-based analysis | Dependent on analyst interpretation and selected methodology |
Outputs In Plain English
Clear forensic answers tied to the schedule record.
Evidence-Backed
Every finding is supported by activity-level schedule evidence.
Pathizer Diagram
Visualize turnover paths, float paths, and schedule logic.
Quantifiable
Measure delay, recovery, and impact in days.
Defensible
Built for project controls, accountability review, and executive decisions.
Pricing
Give your schedule history a defensible review.
Upload historical schedule updates and see how Pathizer identifies delay movement, recovery claims, logic changes, and evidence-backed findings.
SCHEDULE INTELLIGENCE FOR COMPLEX PROJECTS
Pathizer supports complex, high-stakes projects across construction, industrial, oil & gas, power, defense, aerospace, data centers, healthcare, mining, transportation, shipbuilding, and heavy civil environments — enabling faster updates, complete visibility into what changed, precise impact quantification, and defensible, evidence-backed analysis for decisions that carry real cost and risk.
Construction
Industrial
Oil & Gas
Power
Defense
Aerospace & Space
Data Centers
Healthcare
Mining & Metals
Transportation
Shipbuilding
Heavy Civil